Project
Location
Client
Job |
New 220 MW diesel engine power plant
Bellefontaine / Martinique
SGS Industrial Services GmbH (Austria)
Planning and organisation of the building site
» Personnel responsibility for up to 250 staff members
Overall responsibility for
» Constructional steelwork (approx. 4,800 t, steel constructions up to a height of 120 m)
» Equipment installation (approx. 1,200 devices)
» Pipeline construction
» Installation of exhaust gas systems
» Insulation (exhaust gas systems, pipes)
» Scaffolding (approx. 400 t scaffolding material)
» Corrosion protection
» Quality assurance / quality control
|
Period
09/2011 - today |
Project
Location
Client
Job |
New coal-fired power plant Moorburg 2 x 865 MW
Hamburg / Germany
Bilfinger Hochdruck Rohrleitungsbau GmbH
Quality assurance site documentation
» Recording and compiling of as-built documentation incl. welding seam lists, misalignment protocols, heat treatment protocols
» Preparation of documents for final inspections by TÜV (safety standards authority) and final installation inspections |
Period
06/2010 - 11/2011 |
Project
Location
Client
Job |
New HCl – plant
Skikda / Algeria
Ferrostaal Industrieanlagen GmbH
Site Management (installation management)
» Planning and organisation of the building site
» Installation planning
» Resources planning
» Scheduling (MS-Project)
» Planning and supervision of the prefabrication of pipelines and
steel constructions
» Creating of site documentation
» Commissioning planning |
Period
10/2009 - 05/2011 |
Project
Location
Client
Job |
Exchange of 37 heat exchangers / condensers LNG-plant
Arzew / Algeria
Ferrostaal Industrieanlagen GmbH
Site supervision (installation supervision / installation inspection)
» Supervision of disassembly and installation of 37 apparatus (up to 40 tons apparatus weight) incl. transport and placement into the building
» Supervision of pipeline fabrication and pipeline installation
» Supervision of welding and testing work according to ASME code in fabrication and installation
» Supervision of equipment and heavy-equipment installation
» Supervision and approval, insulation, corrosion protection, scaffolding, steel constructions
» Creation of site documentation incl. preparation of final documentation
» Project follow-up (complaints and damage analysis of warranty claims)
|
Period 01/2009 – 03/2011 |
Project
Location
Client
Job |
New solar silicon factory "PV Cristalox"
Bitterfeld / Germany
MCE Industrietechnik GmbH
Site management prefabrication and installation
» Installation management (pipeline construction, secondary steel constructions, heavy-equipment installations)
» Planning and organisation of the construction site
» Installation planning
» Resources planning
» Scheduling (MS-Project)
» Management of pipeline prefabrication (manufacturing supervision)
» Preparation and compilation of additional demands / claims
» Coordination and supervision of third-party work scaffolding, insulation, corrosion protection
» Creation of site documentation
» Supervision of welding work |
Period 07/2008 – 02/2008 |
Project
Location
Client
Job |
Turnaround & inspection 2008, Total Refinery Mitteldeutschland
Spergau / Germany
MCE Industrietechnik GmbH
Site management, repair and inspection of POX methanol plant unit
» Coordination of repair and testing work (NDT)
» Installation personnel management
» Supervision of all installation activities
» Supervision of welding work
» Supervision of schedules
» Coordination of third-party work scaffolding, insulation, corrosion protection |
|
Project
Location
Client
Job |
Maintenance, Total Bitumen Refinery
Brunsbüttel / Germany
MCE Industrietechnik GmbH
Management, repair and maintenance of machines and equipment
» Technical and supervisory management of the maintenance and project personnel
» Guaranteeing the availability of the process plants, the ship/ railway/ tank truck loading facilities, also of the plant's fire brigade and the fleet of vehicles of Total Refinery Brunsbüttel
» Planning and coordination of maintenance work
» Supervision of the execution of internal orders
» Preparation and compilation of additional demands / claims
» Emergency management in case of damages or unscheduled plant shutdowns
» Creation and check of technical documentations e.g. welding procedure specifications, acceptance test certificates, parts lists in fabrication and maintenance
» Recording of plant status and development of optimisation measures
» Monitoring the observation of safety regulations
» Planning of personnel, tools, spare parts and materials for the annual large-scale shutdown of the refinery Brunsbüttel
» Supervision and execution of regular checks of pressure equipment
» Welding supervision according to AD-Merkblatt (instruction sheet) HP 2/1 |
Period 10/2003 – 03/2008 |
Project
Location
Client
Job |
Shut down 2008, Total Bitumen Refinery
Brunsbüttel / Germany
MCE Industrietechnik GmbH
Site management and shut down planning
» Plant safety programme, process systems inspection and repair of pipelines, vessels and columns
» Exchange and repair of rotating equipment, general overhaul of conveyor systems, cleaning and maintenance of sewage treatment works, cleaning and maintenance of steam-generating plants |
Period 09/2007 – 03/2008 |
Project
Location
Client
Job |
Shut down 2007, Total Bitumen Refinery
Brunsbüttel / Germany
MCE Industrietechnik GmbH
Site management and shut down planning
» Plant safety programme, process systems inspection and repair of pipelines, vessels and columns
» Exchange and repair of rotating equipment, general overhaul of conveyor systems, cleaning and maintenance of sewage treatment works, cleaning and maintenance of steam-generating plants |
Period 09/2006 – 03/2007 |
Project
Location
Client
Job |
Shut down 2006, Total Bitumen Refinery
Brunsbüttel / Germany
MCE Industrietechnik GmbH
Site management and shut down planning
» Plant safety programme, process systems inspection and repair of pipelines, vessels and columns
» Exchange and repair of rotating equipment, general overhaul of conveyor systems, cleaning and maintenance of sewage treatment works, cleaning and maintenance of steam-generating plants |
Period 09/2005 – 03/2006 |
Project
Location
Client
Job |
Shut down 2005, Total Bitumen Refinery
Brunsbüttel / Germany
MCE Industrietechnik GmbH
Site management and shut down planning
» Plant safety programme, process systems inspection and repair of pipelines, vessels and columns
» Exchange and repair of rotating equipment, general overhaul of conveyor systems, cleaning and maintenance of sewage treatment works, cleaning and maintenance of steam-generating plants |
Period 09/2004 – 03/2005 |
Project
Location
Client
Job |
Shut down 2004, Total Bitumen Refinery
Brunsbüttel / Germany
MCE Industrietechnik GmbH
Site management and shut down planning
» Plant safety programme, process systems inspection and repair of pipelines, vessels and columns
» Exchange and repair of rotating equipment, general overhaul of conveyor systems, cleaning and maintenance of sewage treatment works, cleaning and maintenance of steam-generating plants |
Period 10/2003 – 03/2004 |
Project
Location
Client
Job |
Maintenance of tank farm and loading facilities,
Total Refinery Mitteldeutschland
Spergau / Germany
MCE VOEST VEA GmbH
Welding and installation services
» Repair and construction of pipelines for flammable liquids and gases in the refinery tank farm, in the tank-truck and railway loading facilities
» Exchange and repair of vacuum double bottoms and floating tank-roofs in crude-oil tanks (dia. 50 m; 30,000 cbm storage capacity)
» Installation and piping of slop tanks for the dewatering of crude-oil tanks |
Period 01/2001 – 09/2003 |
Project
Location
Client
Job |
Prefabrication and installation of osmosis plants
Stuttgart / Germany
Hager & Elsässer GmbH
Welding and installation services
» Prefabrication and installation of osmosis plants |
Period 09/2000 – 02/2000 |